• <optgroup id="chkmz"><em id="chkmz"><pre id="chkmz"></pre></em></optgroup>
  • <optgroup id="chkmz"></optgroup>
      1. <ol id="chkmz"><blockquote id="chkmz"></blockquote></ol>

            1. Exhaust gas self-monitoring program

              Time:2018-12-08
              Automatic monitoring requirements for exhaust gas pollutants: Calibration and maintenance of automatic monitoring equipment in accordance with the Technical Specifications for Continuous

                  Exhaust gas self-monitoring program

                 1.Waste gas and wastewater monitoring program

              Table 1 Self-monitoring plan

              Serial number            Pollution source categoryDrain port number 
              Drain port nameMonitoring content (1)Contaminant nameMonitoring facilityAutomatic monitoring of networkingAutomatic monitoring instrument nameAutomatic monitoring facility installation locationAutomatically monitor whether the facility meets the management requirements for installation, operation, maintenance, etc.Manual monitoring sampling method and number (2)Manual monitoring frequency (3)anual measurement method (4)Other information
              1
              DW001
              pH, total cadmium, total lead, total mercury, total arsenic, flowTotal arsenicmanual



              Mixed sampling at least 3 mixed samples1 time / seasonWater quality - Determination of total arsenic - Diethyldithiocarbamate silver spectrophotometric method GB 7485-87
              2     

              DW001
              pH, total cadmium, total lead, total mercury, total arsenic, flowTotal mercurymanual



              Mixed sampling at least 3 mixed samples1 time / seasonWater quality Determination of total mercury Cold atomic absorption spectrophotometry HJ 597-2011 Replaces GB 7468-87 1 time / quarter
              3

              DW001
              pH, total cadmium, total lead, total mercury, total arsenic, flowTotal leadmanual



              Mixed sampling at least 3 mixed samples1 time / seasonWater quality - Determination of copper, zinc, lead and cadmium Atomic absorption spectrophotometric method GB 7475-87
              4

              DW001
              pH, total cadmium, total lead, total mercury, total arsenic, flowTotal cadmmanual



              Mixed sampling at least 3 mixed samples1 time / season1 time / seasonWater quality - Determination of copper, zinc, lead and cadmium Atomic absorption spectrophotometric method GB 7475-87
              5

              DW001
              pH, total cadmium, total lead, total mercury, total arsenic, flowpHmanual



              Mixed sampling at least 3 mixed samples1 time / season1 time / season
              Water quality Determination of pH value Glass electrode method GB/T 6920-86

              6

              DA001
              Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentMercury and its compoundsmanual



              Non-continuous sampling at least 31 time / season1 time / seasonFixed source pollution - Determination of mercury - Cold atomic absorption spectrophotometric method (provisional) HJ 543-2009
              7

              DA001
              Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentSmokeautomaticYesSCS-900PM soot automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursBoiler dust test method GB 5468-91 instead of GB 5468-85
              8

              DA001
              Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentNitrogen oxidesautomatic
              SCS-900 flue gas automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursFixed pollution source exhaust gas Determination of nitrogen oxides Constant potential electrolysis method HJ 693-2014
              9

              DA001
              Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentSulfur dioxideautomaticYesSCS-900 flue gas automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursDetermination of sulfur dioxide in fixed pollution source exhaust gas. Constant potential electrolysis method HJ/T 57-2000
              10

              DA001
              Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentRingman blackmanualYes


              Non-continuous sampling at least 31 time / seasonDetermination of blackness of flue gas from fixed pollution sources. Lingeman smoke blackness map method HJ/T 398-2007
              11

              Factory boundary
              otal suspended particulate matter (aerodynamic equivalent diameter of 100 μm or less)otal suspended particulate matter (aerodynamic equivalent diameter of 100 μm or less)manual



              Non-continuous sampling at least 31 time / seasonWeighing method


              2.Evaluation criteria for wastewater monitoring results (Schedule 2)

              2 Wastewater pollutant discharge implementation standard table

              Serial numberDrain port numberDrain port nameType of pollutantNational or local pollutant discharge standards (1)
              nameConcentration limit (mg/L)other information
              1
              DW001
              Total arsenicComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.5

              2
              DW001
              Total cadmComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.1

              3
              DW001
              Total mercuryComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.01

              4
              DW001
              PHComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20076-9

              5
              DW001
              Total leadComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20071.0


              3.Evaluation criteria for exhaust gas monitoring results (Schedule 3)

              Table 3 Exhaust pollutant discharge implementation standard table

              Serial numberDrain port numberDrain port nameType of pollutantNational or local pollutant discharge standards (1)other information
              name
              oncentration limit (mg/Nm3)
              3
              DA001
              Nitrogen oxides"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 46100

              4
              DA001
              Sulfur dioxide"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 4635

              5
              DA001
              Smoke"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 4610

              四、Factory boundary noise monitoring program

              1、Factory boundary noise monitoring content

              Table 4 Noise monitoring at the boundary of the plant

              Point layout          

              Monitoring project          

              Frequency of monitoring             

              Monitoring method and   in accordance with

                       

              Four borders from east to west and north and south of the factory    

              Leq        

              Once a season             

              "Environmental Noise Emission Standards for Industrial Enterprises' Boundaries"

              GB12348-2008
                       

              2、Factory boundary noise evaluation standard

              The noise at the boundary of the plant implements the Class 3 standard of GB12348-2008 "Environmental Noise Emission Standard for Industrial Enterprises Boundary", with 晝: 65dB(A) and 55dB(A) at night.


              五、Self-monitoring requirements

              (1) Automatic monitoring quality assurance

              1. Personnel requirements: Persons with more than two training certificates for the effectiveness of the automatic monitoring data of pollution sources issued by the provincial environmental protection authorities.

              2. Automatic monitoring requirements for exhaust gas pollutants: Calibration and maintenance of automatic monitoring equipment in accordance with the Technical Specifications for Continuous Monitoring of Flue Gas Emissions from Fixed Sources (Trial) (HJ/T75-2007).

              3. Recording requirements: The operation and maintenance records of the automatic monitoring equipment, and the contents of all kinds of original records should be complete and signed by relevant personnel for three years.

              (2) Entrusted monitoring
              1. Entrusted by the qualified social inspection (supervision) testing agency or the environmental monitoring agency of the environmental protection department to conduct manual self-monitoring on its behalf, and entrusted monitoring must sign an agreement.
              2. The environmental monitoring agency of the environmental protection department that undertakes the supervisory monitoring task shall not undertake the self-monitoring entrusted business of the supervised enterprise.

              六、Self-monitoring information

              (1) Method of publication
              1. The enterprise shall promptly report the self-monitoring information to the municipal environmental protection department in accordance with the requirements, and announce the self-monitoring information to the public on the website of the municipal environmental protection department.
              2. The company publicly monitors the information through the external website of Gushen Biotechnology Group Co., Ltd.

              (2) Announcement content

              Company name          

              Gushen Biotechnology Group Co., Ltd.  

              legal representative                

              Zhang Ween                

              Production and operation site address            

              Middle section of Caiyuan Road, Lingxian Economic Development Zone            

              Postal code (1)            

              253500                

              Industry category              

              Bean products manufacturing              

              Whether to put into production (2)                

              YES               

              Production date (3)             

              2007-01-01              



              Production and operation center center longitude (4)            

              116°54′41′′              

              Production and operation site center latitude (5)                

              37°36′9′′       

              Organization Code

                           


              Unified social credit code             

              91371421723850818U                

              Technical director         

              Zhao Guozhu            

              Contact number                

              0534-8295258                

              Automatic monitoring manufacturer              

              Beijing Xuedilong Technology Co., Ltd.             

              Commissioned monitoring agency         

                               

              Shandong PerryEnvironmental Protection Monitoring Co., Ltd.                        


                            

              1. Self-monitoring program
              2. Self-monitoring projects and results: all monitoring points, monitoring time, pollutant types and concentrations, standard limits, compliance standards, excess standards, pollutant discharge methods and emission destinations
              3. Reasons for not conducting self-monitoring;
              4. Annual report on pollution source monitoring.

              (3) Announcement time limit

              1. The basic information of the enterprise shall be announced together with the monitoring data. If the basic information and self-monitoring plan are adjusted and changed, the latest contents shall be announced within five days after the change;

              2. Manual monitoring data shall be published after each report is issued;

              3. The automatic monitoring data should announce the monitoring results in real time, and the automatic monitoring equipment for exhaust gas is the average value per hour;

              4. Announce the annual report of self-monitoring last year before the end of January each year.



              日本道二区免费v_亚洲日韩中字幕日本_99re8这里有精品热视频,思思99re66热这里只有精品,清纯女友健身房被调教,亚洲国产在线资源网